建筑工程主体结构检测
发布时间:2019-11-29 19:25 阅览量:

一、建筑工程主体结构检测方法

I. inspection method for main structure of construction project

1.1主要内容

1.1 main contents

对工程建筑质量中主体结构质量检测的主要内容有对建筑工程主体结构中钢筋保护层的钢筋数量及位置进行抽查,对工程中的砼回弹、砂浆、砌体、钻芯检测及测砼强度等。

The main content of the quality inspection of the main structure in the construction quality includes the spot check of the quantity and position of the reinforcement in the main structure of the construction project, the inspection of the concrete rebound, mortar, masonry, core drilling and the measurement of the concrete strength.

1.2质量检测的主要手段

1.2 main means of quality inspection

在对建筑工程主体结构进行检测时,主要有以下几点:

When testing the main structure of the construction project, there are mainly the following points:

1)实体检测是其中的重点之一,而这一工作又具有较强的随机性,特别是对样本空间的确定上需要遵守相关标准的需求,同时还应该具备对实体的针对性;

1) entity detection is one of the focuses, and this work has strong randomness, especially the need to comply with the relevant standards in the determination of sample space, and at the same time, it should also have the pertinence to entities;


2-1Q130111323.jpg


2)委托的检测机构或者监督人员进行监督时,除了需要对结构的外观、尺寸进行检测之外,还要对实体进行检测,并且一定要制定具体的检测方案流程,并告知施工方、监督站;

2) when the entrusted testing agency or supervisor supervises, in addition to the appearance and size of the structure, it is also necessary to test the entity, and it is necessary to formulate specific testing program flow, and inform the construction party and the supervision station;

3)如果需要采取可能致使工程质量受到局部影响的检测方案,必须要征求设计方的意见,才可执行;

3) if it is necessary to adopt the detection scheme that may cause local impact on the project quality, the designer's opinion must be solicited before implementation;

4)如果是由监督站进行具体的检测,必须要由监督机构相关部门制定监督方案,而如果是外聘检测单位,则应该由检测单位制定检测方案,并且提供给监督站进行审核;

4) if the supervision station is responsible for specific inspection, the relevant departments of the supervision institution must formulate the supervision scheme. If the external inspection unit is employed, the inspection unit shall formulate the inspection scheme and provide it to the supervision station for review;

5)对工程实体的检测与质量验收不同,其中实体检测是进行随机抽样调查工作,因此对目的的把握一定要清晰,利用操作简单、科学有效的手段进行检测,大多数情况下可使用监督小组现场立操作的方法;

5) the inspection and quality acceptance of Engineering entities are different, among which the entity inspection is to carry out random sampling investigation, so the purpose must be clear, and the simple, scientific and effective means should be used for inspection. In most cases, the method of independent operation on site by the supervision team can be used;

6)进行常规检测时,如果发现有质量疑义的构件不能通过现场进行检测的构件,应该对该构件进行针对性的部位检测,以准确的反映实际情况,不能随意扩大范围。

6) during routine inspection, if it is found that the component with quality doubt can not pass the on-site inspection, the component shall be tested for specific parts to accurately reflect the actual situation and not expand the scope at will.

1.3进行抽样检测的原则

1.3 principle of sampling inspection

2-1Q130111333-50.jpg

建筑工程的主体结构质量检测必须要符合科学合理的质量判断,其重点就是抽样的合理选取,按照检测的目的大致可分类确定的抽样空间如下;

The quality inspection of the main structure of the construction project must conform to the scientific and reasonable quality judgment, and the key point is the reasonable selection of sampling. According to the purpose of the inspection, the sampling space can be roughly classified and determined as follows:;

1)按照材料类型及结构类型进行抽查规划,对一般质量行为进行抽查:按照级别划分,靠前级按照结构类型可分为:钢结构、钢筋混凝土结构、砌体结构等;第二级按照构件的类型可划分为:梁、柱、墙;第三级可根据材料类型划分;

1) carry out spot check planning according to material type and structure type, and carry out spot check on general quality behaviors: according to the level, the first level can be divided into steel structure, reinforced concrete structure, masonry structure, etc. according to the structure type; the second level can be divided into beam, column, wall, etc. according to the component type; the third level can be divided according to the material type;

2)按照检测的类型及所使用检测批的容量来选取样本容量,对有异议的构件进行检测:不仅监督机构需要对构件进行抽查,而且施工责任单位也需要委托检测单位进行有关的检测,来保证施工满足设计要求及规范标准。其中监督机构做出的抽检应该大于总抽检次数的10%。

2) select the sample capacity according to the type of testing and the capacity of the used testing batch, and test the components with objections: not only the supervision organization needs to carry out spot check on the components, but also the construction responsible unit needs to entrust the testing unit to carry out relevant tests to ensure that the construction meets the design requirements and specification standards. Among them, the sampling inspection made by the supervision organization should be more than 10% of the total sampling inspection times.

二、有关注意事项

II. Precautions

1)检测人员进行检测时必须要注意人身安全;

1) the testing personnel must pay attention to personal safety when testing;

2)检测过程中,检测人员、委托方及相关责任人均应该在现场;

2) during the detection, the detection personnel, the entrusting party and relevant responsible persons shall be on site;

3)对于拟定的方案不能做出随便改变,如果确实需要改变,必须要要由各方同意并签字才可进行更改;

3) the proposed scheme cannot be changed casually. If it really needs to be changed, it must be agreed and signed by all parties before it can be changed;

4)因为检测报告是检测机构做出的结论,因此在未签发时,是可以进行更改的。

4) since the test report is the conclusion made by the testing agency, it can be changed when it is not issued.

三、结论

Three. Conclusion

建筑工程主体结构的质量检测监督工作人员必须要具备专业的理论知识及丰富的实际经验,另外还需要具备责任心、树立使命感,才可进行这项具备挑战性的任务。在具体检测过程中,建筑工程检测人员必须要熟悉指定检测流程,强化监督意识,注意各个环节的注意事项,另外还需要及时总结经验教训,发挥监督管理的灵活性、有效性、合理性,进而确保工程质量的安全。

The quality inspection and supervision personnel of the main structure of the construction project must have professional theoretical knowledge and rich practical experience. In addition, they need to have a sense of responsibility and a sense of mission to carry out this challenging task. In the specific detection process, the construction project detection personnel must be familiar with the designated detection process, strengthen the sense of supervision, pay attention to the precautions of each link, in addition, they also need to summarize the experience and lessons in time, give play to the flexibility, effectiveness and rationality of supervision and management, so as to ensure the safety of project quality.